HANDOFF: M-29 session summary + the 3-track plan (A=playtest gate,
B=audio DEFERRED, C=solo quick wins in priority order).
BRIEF-B2-depot-textures.md: captured evidence + leading hypothesis that
the Depot roof garbage is mostly BACKLOG B1 (missing filtering/mips),
not a decode bug; decode path audited clean.